What a ship.... no wonder 'Made in China' is displacing North American goods big time with this floating continent transporting goods across the Pacific in 4 days no less!
This is how Wal-Mart gets all it's stuff from China . Get a load of this ship! 15,000 containers and a 207' beam! And look at the crew-size: 13 people for a ship longer than a US aircraft carrier which has a crew of 5,000 men and officers.
Think it's big enough? Notice that 207' beam means it cannot fit through the Panama or Suez Canals . It is strictly transpacific. Check out the cruise speed: 31 knots means the goods arrive 4 days before the typical container ship (18-20 knots) on a China-to-California run. So this behemoth is hugely competitive when carrying perishable goods.
This ship was built in five sections. The sections floated together and then welded. The command bridge is higher than a 10-story building and has 11 cargo crane rigs that can operate simultaneously.
Think it's big enough? Notice that 207' beam means it cannot fit through the Panama or Suez Canals . It is strictly transpacific. Check out the cruise speed: 31 knots means the goods arrive 4 days before the typical container ship (18-20 knots) on a China-to-California run. So this behemoth is hugely competitive when carrying perishable goods.
This ship was built in five sections. The sections floated together and then welded. The command bridge is higher than a 10-story building and has 11 cargo crane rigs that can operate simultaneously.
Additional info:
Country of origin - Denmark
Length - 1,302 ft
Width - 207 ft
Net cargo - 123,200 tons
Engine - 14 in-line cylinders diesel engine (110,000 BHP)
Cruise Speed - 31 knots
Cargo capacity - 15,000 TEU
Crew - 13, with room for 30
First Trip - Sept. 08, 2006
Construction cost - US $145,000,000+
Silicone painting applied to the ship bottom reduces water resistance and saves 317,000 gallons of diesel per year
Country of origin - Denmark
Length - 1,302 ft
Width - 207 ft
Net cargo - 123,200 tons
Engine - 14 in-line cylinders diesel engine (110,000 BHP)
Cruise Speed - 31 knots
Cargo capacity - 15,000 TEU
Crew - 13, with room for 30
First Trip - Sept. 08, 2006
Construction cost - US $145,000,000+
Silicone painting applied to the ship bottom reduces water resistance and saves 317,000 gallons of diesel per year
The ship was built at the Odense Steel Shipyard in Denmark. In June 2006, during construction, welding work caused a fire within her superstructure. It spread rapidly through the accommodation section and bridge, which delayed the ship by six to seven weeks. Emma Mærsk was named in a ceremony on 12 August 2006. The ship is named after Emma Maersk, Maersk Mc-Kinney Moller's late wife.
No comments:
Post a Comment